I’m feeling a bit smug with myself, something must go wrong!
The studio and darkroom are now re-wired with new sockets and lighting.
Plumbing is all but sorted, there was a problem with water pressure, turned out the pipe cutting joint hadn’t cut through far enough and resulted in very poor flow. A few turns of a spanner and click the pipe cut through properly and now Its perfect.
Moved the 5×4 enlarger into the darkroom, I think the layout is going to be just fine for my needs.
All thats left to do is plumbing outside into the soil pipe, tomorrow, and a final clear up of some small jobs. Its taken a while but I’m getting there….